Notes on architecture, construction and life between two countries.
An afternoon in the studio for anyone thinking about building. Drawings on the table, costs discussed openly, no sales pitch.
Our second villa in Sleman is finished. Fourteen months from first site visit to handover.
We are looking for one junior architect to join the studio in Sleman, working on houses from drawings through to site.
Twenty years of practice in Korea did not prepare me for a site meeting that begins with rain, ends with rain, and involves no drawings at all.
In every house we have built in Yogyakarta, the room the client uses most is the one without walls.
A plain description of our five stages, what you receive at each one, and roughly how long each takes.